Skip to content
P1039611-grey wash

About Us

Our Story
Dedicated to innovating, and reframing, how the world builds for over 35 years.
Why Steel Framing
Known as cold-formed or light gauge, steel is a modern framing solution to build fast and built to last.
Careers

Interested in joining a team that’s shaping the future of construction?

applications-mega menu

Applications

Mid-rise Buildings
Our systems support a wide range of medium-rise applications, including residential apartments and commercial buildings.

Modular Construction
Whether it’s offsite construction, volumetric builds, bathroom pods, tiny homes, or ADUs, our systems streamline your modular projects.

Disaster Relief
Provide rapid construction capabilities directly to disaster-affected areas to quickly erect safe, durable structures.
Residential Housing
From single-family homes to multi-unit developments and build-to-rent housing, our solutions provide the versatility you need.

Interior Drywall Framing
Perfect for internal fit-outs, our solutions ensure precision and speed in drywall framing.

Bathroom Pods
Bathroom pods streamline production, reduce onsite complexity, and deliver consistent, high-quality wet areas.
Commercial Structures

For retail outlets, office buildings, quick-service restaurants (QSR), or mixed-use developments, we offer tailored systems to meet your needs.


Facades and Curtain Walls
Our solutions combine stunning aesthetics with robust durability, making your project stand out and last.
support-mega menu

Products

Design & Engineering
Steel framing software, offering precise detailing, real-time engineering analysis, and easy tool integration.

Production Management
Gain complete visibility and control of your operations with real-time data, quality control, and capacity management.
Roll Forming Equipment
Whether single-profile or multi-profile, our machines offer you the versatility and world-class reputation you need to deliver your projects.

Building Components
Your one-stop shop for everything you need: connectors, fasteners, and steel coils to get your projects rolling.
menu-nav-support

Support 

Customer Success
Fast-track your steel framing journey with our education, services, and support.
Communities
Your central portal for all business needs. Access support, Nexa, the Knowledge Center, shop, and training videos in one place.
menu-nav-resources

Resources

Blog
Get the latest insights and updates on steel framing, construction trends, and industry news.

Case Studies
See steel framing in action with real-world examples from our customers.

eBooks
Access guides and in-depth resources on steel framing and its benefits for various construction projects.
Videos
Watch informative videos, including product demos, educational content, and expert interviews.

Events
Join our local steel framing events or come visit us at one of our global tradeshows.

FRAMECAD Connect
Looking for steel frames? FRAMECAD Connect partners are specialists in designing, manufacturing, and building with the FRAMECAD System.
blog-post-desktop
The FRAMECAD TeamApr 20, 20172 min read

Say Goodbye to Project Delays and Revisions

Say Goodbye to project delays and revisions

When getting a new building project off the ground, delays caused by engineering reviews and revisions are inevitable. Or are they? 

There is a better way; the FRAMECAD Cold Formed Steel intelligent software suite.

As you take your project through design, pre-engineering, drafting and engineering phases, there are multiple points at which revisions will be made.

Those revisions can impact engineered elements of the building, requiring the attention of engineering consultants. Not knowing when the engineering revisions will be approved can be frustrating. It also drives up costs.

FRAMECAD cold-formed steel design and engineering software allows you to sidestep these issues.

Real-time adjustments

FRAMECAD Structure is a computer-aided design (CAD) solution which performs engineering calculations as you design the building. Make a change to design, and the engineering calculations are automatically amended (at a pace of around 25,000 calculations per second, FRAMECAD Structure is faster than any engineer we know. It’s also accurate and instant

Using FRAMECAD Structure, design changes don’t present the headache they are traditionally known for. If (or when) things change during the approval process, the cost of the amendments is minimized.

At the same time, FRAMECAD Structure automatically ensures that your project complies with your local building code; no need to wait for the engineer to run his ruler over it before moving on to the next phase.

Preparing your designs for the real world

FRAMECAD Detailer, as the name implies, takes your designs and adds the finishing touches, preparing to move your project into the ‘build’ phase.

FRAMECAD Detailer equips operators to review the engineered design files, and provides ‘virtual walkthrough’ visualization, allowing draftspeople to check details and optimize the design where necessary, thus eliminating on-site correction time.

The FRAMECAD Detailer software covers the detailing of the component parts, as well as the generation of shop drawings to be used by the production team to carry out the initial phase of construction with ease.

Finally, FRAMECAD Detailer outputs a file that is read by the cold-formed steel manufacturing equipment-  readying your project up project for the manufacturing phase.

The bottom line

With automated engineering in FRAMECAD Structure, your engineering input is substantially reduced and along with that, the costs of design fall significantly too.

Automating your construction processes delivers two significant competitive advantages which all construction-based customers appreciate: lower cost and faster project delivery.

To learn more about the advantages of FRAMECAD Software, and investigate the possible project and business gains for your company, read more here

RELATED ARTICLES